1. Task Name: Perform Development Cycle Review
2. Purpose: After the design portion of each rapid application development cycle, the system requirements, software requirements, and the software and database designs are reviewed for completeness, consistency, and adequacy. The documents reviewed compose an allocated baseline. If the review determines that all release requirements are satisfactorily addressed in the designs, then the remainder of the development cycle is completed and the remaining tasks in this activity which prepare the release for system testing are performed. If the review determines that all release requirements have not been satisfactorily addressed by the designs, the development cycle is completed and another is begun. After requirements are changed or expanded, and the next cycle's design procedures are performed, the next version of the allocated baseline documents will be produced and this review will be repeated. This review thus provides the opportunity to determine whether the design is ready to move to system testing and implementation after each cycle in rapid application development.
3. Roles: Functional Analyst, Software Engineer, Database Administrator, Tester, Architecture Engineer
4. References: None
5. Entrance Criteria:
a. System Requirements Specification (SRS) (Word 80KB)
b. Software Requirements Description (SRD) (Word 46KB)
c. Infrastructure Requirements Description (IRD) (Word 34KB)
d. Software Architecture Description (SAD) (Word 34KB)
e. Database Design Description (DBDD) (Word 51KB)
f. Software Design Description (SDD) (Word 35KB)
g. Software Interface Design Description (SIDD) (Word 60KB)
h. Software Configuration Index Record (SCIR) (Word 33KB)
i. User's Manual (UM) (Word 46KB)
j. Operator's Manual (OM) (Word 38KB)
k. Release Plan
l. Review Checklist Standard (Word 40KB)
m. Review Report Standard (Word 31KB)
6. Procedures: (Word)
a. Schedule and announce the review and distribute materials for the review
b. Review published materials and identify issues; send to review chairman,
or as delegated
c. Receive, analyze, and consolidate identified issues
d. Conduct the review
e. Prepare and distribute reports from the review
7. Exit Criteria:
a. Review Checklist (Word 40KB)
b. Review Report (Word 31KB)
8. Estimation Criteria:
9. Measures: