|
1. Task Name: Prepare Application Release Checklist
2. Purpose: Release plans and release design documents are reviewed to prepare a detailed application release checklist. This checklist will show all components required for release and dependencies among components.
3. Roles: Software Engineer, Database Administrator, Architecture Engineer
4. References: None
5. Entrance Criteria:
a. Application Release Checklist (ARC) Standard (Word 41KB)
b. Software Development Plans (SDP) (Word 38KB)
c. Software Configuration Index Record (SCIR) (Word 33KB)
d. Detailed Requirements
e. Software Design
f. Database Design
g. Architecture Design
h. Web Design
i. Test Scripts (Word 75KB)
6. Procedures:
a. Review release plans and release design documents
b. Identify release components and release scripts
7. Exit Criteria:
a. Application Release Checklist (ARC) (Word 41KB)
8. Estimation Criteria:
9. Measures:
Please direct questions/comments about this page to the DFAS PAL Administrator at pal.admin@dfas.mil, DFAS-TA/IN
|